Scheduling That Holds Up; From Logic to Litigation

Learn to Evaluate, Validate, and Use Schedules as Real Tools for Cost and Claims

Most schedules look fine until they are used. This course goes beyond bar charts to show how schedules shape cost, risk, and accountability. You will learn to link estimates with timelines, check schedule logic, uncover critical path issues, and interpret impacts with confidence. From schedule integration to forensic review, this training builds the insight you need to use project schedules as part of your cost estimating and project control toolkit.

What You Wil Learn

Explore the full list of modules and lessons included in this course.

    1. 1.0 Welcome and Orientation

    2. 1.1 Learning Outcomes, Certification Programs Credits, and Time Commitment

    3. 1.2 Evaluation and Course Navigation

    4. 1.3 Assignment – General Knowledge Check

    1.  2.1 Why Scheduling Accuracy Matters for Cost Estimates

    2.  2.1 Why Scheduling Accuracy Matters for Cost Estimates - Quiz

    3.  2.2 Linking Cost Breakdown Structures (CBS) with Schedule Activities

    4.  2.2 Linking Cost Breakdown Structures (CBS) with Schedule Activities - Quiz

    5. 2.3 Time-Phased Cost Loading and Cash Flow Forecasting

    6. 2.3 Time-Phased Cost Loading and Cash Flow Forecasting - Quiz

    7. 2.4 Schedule Alignment with Estimate Classes and Contingency Planning

    8. 2.4 Schedule Alignment with Estimate Classes and Contingency Planning - Quiz

    9. 2.5 Assignment – Creating a Time-Phased Estimate Based on Schedule

    1. 3.1 Schedule Health Indicators and Audit Criteria

    2. 3.1 Schedule Health Indicators and Audit Criteria - Quiz

    3. 3.2 Logic Errors, Open Ends, and Out-of-Sequence Work

    4. 3.2 Logic Errors, Open Ends, and Out-of-Sequence Work - Quiz

    5. 3.3 Review of Critical Path Integrity and Path Convergence

    6. 3.3 Review of Critical Path Integrity and Path Convergence - Quiz

    7. 3.4 Schedule Density and Level of Detail Evaluation

    8. 3.4 Schedule Density and Level of Detail Evaluation - Quiz

    9.  3.5 Assignment – Schedule Review and Diagnostics Walkthrough

    1. 4.1 Common Types of Delays: Excusable, Compensable, Concurrent

    2. 4.1 Common Types of Delays: Excusable, Compensable, Concurrent - Quiz

    3. 4.2 Delay Analysis Methods

    4. 4.2 Delay Analysis Methods - Quiz

    5. 4.3 Schedule Fragments and Time Impact Analysis Techniques

    6. 4.3 Schedule Fragments and Time Impact Analysis Techniques - Quiz

    7. 4.4 Documenting and Supporting Claims with Scheduling Data

    8. 4.4 Documenting and Supporting Claims with Scheduling Data - Quiz

    9. 4.5 Assignment – Basic Delay Analysis Using Case Scenario

    1. 5.1 Role of the Forensic Scheduler and Estimator in Dispute Resolution

    2. 5.1 Role of the Forensic Scheduler and Estimator in Dispute Resolution - Quiz

    3. 5.2 Reconstructing As-Built Schedules and Progress Histories

    4. 5.2 Reconstructing As-Built Schedules and Progress Histories - Quiz

    5. 5.3 Schedule and Cost Records as Evidence

    6. 5.3 Schedule and Cost Records as Evidence - Quiz

    7. 5.4 Presenting Schedule-Based Claims to Stakeholders or Arbitrators

    8. 5.4 Presenting Schedule-Based Claims to Stakeholders or Arbitrators - Quiz

    9. 5.5 Assignment – Forensic Review of Schedule Delays and Costs

    1. 6.1 Advanced Primavera P6 and MS Project Functions

    2. 6.1 Advanced Primavera P6 and MS Project Functions - Quiz

    3. 6.2 Visualizing Cost and Time Dependencies Using 4D BIM

    4. 6.2 Visualizing Cost and Time Dependencies Using 4D BIM - Quiz

    5. 6.3 Data Integration with Earned Value Management (EVM) Systems

    6. 6.3 Data Integration with Earned Value Management (EVM) Systems - Quiz

    7. 6.4 Scenario Planning and Monte Carlo Simulation Basics

    8. 6.4 Scenario Planning and Monte Carlo Simulation Basics - Quiz

    9. 6.5 Assignment – Building Multi-Scenario Schedule Models

About this course

  • $1,230.00
  • 53 lessons
  • Total learning commitment to complete this course: 32 hours
  • Course format: text, presentations, audio, downloadable PDF's.

Collaboration is essential

The benefit of timely feedback.

All lessons have a dedicated discussion section so you can ask questions, see previously answered questions, interact with other course participants and your instructor. You do not have to go through this learning journey alone or have to ponder on unanswered questions.

Master the Fundamentals: Strengthen Your Skills in Cost Estimating Workflow and Methodology

This course is part of the Construction Estimating Workflow and Methodology bundle. Build the full skillset and save 35%, a structured way to learn the complete process.