Shaping the Site, Controlling the Cost

Estimate Earthworks with Clarity, Confidence, and Control

From stripping topsoil to final compaction, earthworks set the pace and risk profile for the entire build. This course brings structure to the estimating process, linking quantities to methods, crews to site conditions, and numbers to real-world outcomes. It is for professionals who want estimates that hold up in meetings, on site, and in execution.

What You Will Learn

Explore the full list of modules and lessons included in this course.

    1. 1.1 Course Structure

    2. 1.2 Course Expected Outcome

    3. 1.3 Completion Certificates and Certification Programs Credits

    4. 1.4 A Word From Your Instructor

    5. 1.5 Expected Level of Effort to Completion

    6. 1.6 Evaluation Matrix

    7. 1.7 Prerequisite

    8. 1.8 Assignment - General Knowledge

    1. 2.0 Introduction

    2. 2.1 The Role of Documentation in Earthworks Cost Estimating

    3. 2.2 Reviewing Project Documentation (Plans, Geotechnical Reports, and Specifications)

    4. 2.2 Reviewing Project Documentation (Plans, Geotechnical Reports, and Specifications) - Quiz

    5. 2.3 Understanding Tender Requirements and Bid Instructions

    6. 2.3 Understanding Tender Requirements and Bid Instructions Quiz

    7. 2.4 Navigating Bid Closing Procedures and Compliance Considerations

    8. 2.4 Navigating Bid Closing Procedures and Compliance Considerations Quiz

    9. 2.5 Evaluating Site Conditions from Available Documentation

    10. 2.5 Evaluating Site Conditions from Available Documentation Quiz

    11. 2.6 Assessing Market Conditions and Cost Drivers for Earthworks Estimating

    12. 2.6 Assessing Market Conditions and Cost Drivers for Earthworks Estimating Quiz

    13. 2.7 Assignment – Interpreting and Extracting Key Information from Project Documents

    1. 3.0 Introduction

    2. 3.1 Understanding Soil Types and Interpreting Geotechnical Reports

    3. 3.1 Understanding Soil Types and Interpreting Geotechnical Reports - Quiz

    4. 3.2 Evaluating Water Table Conditions and Dewatering Requirements

    5. 3.2 Evaluating Water Table Conditions and Dewatering Requirements - Quiz

    6. 3.3 Slope Stability and Protection Measures (Shoring, Benching, and Retaining Systems)

    7. 3.3 Slope Stability and Protection Measures (Shoring, Benching, and Retaining Systems) - Quiz

    8. 3.4 Site Haul Planning and Logistics (Haul Distance, Routes, and Equipment Selection)

    9. 3.4 Site Haul Planning and Logistics (Haul Distance, Routes, and Equipment Selection) - Quiz

    10. 3.5 Material Handling and Placing (Stockpiling, Transport, and Spreading)

    11. 3.5 Material Handling and Placing (Stockpiling, Transport, and Spreading) - Quiz

    12. 3.6 Assignment – Site Evaluation and Strategic Planning for Earthworks

    1. 4.0 Introduction

    2. 4.1 Methods for Cut/Fill Calculations (End-Area and Grid Cell Methods)

    3. 4.1 Methods for Cut/Fill Calculations (End-Area and Grid Cell Methods) - Quiz

    4. 4.2 Understanding and Applying Mass Haul Diagrams

    5. 4.2 Understanding and Applying Mass Haul Diagrams- Quiz

    6. 4.3 Bulk Excavation: Techniques and Volume Estimation

    7. 4.3 Bulk Excavation: Techniques and Volume Estimation - Quiz

    8. 4.4 Bulk Backfill: Volume Estimation and Material Sourcing Considerations

    9. 4.4 Bulk Backfill: Volume Estimation and Material Sourcing Considerations - Quiz

    10. 4.5 Detailed Excavation: Precision in Depths, Trenching, and Specialized Digging

    11. 4.5 Detailed Excavation: Precision in Depths, Trenching, and Specialized Digging - Quiz

    12. 4.6 Detailed Backfill: Compaction Considerations and Layering Techniques

    13. 4.7 Ground Improvement: When and How It Affects Earthworks Estimates

    14. 4.7 Ground Improvement - Quiz

    15. 4.8 Utilizing Software Tools for Quantity Take-offs (Introduction to PlanSwift and Alternatives)

    16. 4.9 Assignment – Performing Quantity Take-offs from Sample Data

    1. 5.0A Preparing for Cost Development: Technical Depth and Learning Approach

    2. 5.0 Introduction

    3. 5.1 Construction Activities - Excavation

    4. 5.1 Construction Activities - Excavation - Quiz

    5. 5.2 Construction Activities - Backfill

    6. 5.2 Construction Activities - Backfill - Quiz

    7. 5.3 Construction Activities - Material Handling

    8. 5.3 Construction Activities - Material Handling - Quiz

    9. 5.4 Construction Activities - Dewatering

    10. 5.4 Construction Activities - Dewatering - Quiz

    11. 5.5 Construction Activities -Slope Protection

    12. 5.5 Construction Activities -Slope Protection - Quiz

    13. 5.6 Ground Improvement: Cost Awareness and Estimating Considerations

    14. 5.6 Ground Improvement: Cost Awareness and Estimating Considerations - Quiz

    15. 5.7 Productivity, Labour Rates, and Equipment Rates in Earthworks Estimating

    16. 5.7 Productivity, Labour Rates, and Equipment Rates in Earthworks Estimating - Quiz

    17. 5.8 Crews and Productivity Rates - Excavation

    18. 5.8 Crews and Productivity Rates - Excavation - Quiz

    19. 5.9 Crews and Productivity Rates - Backfill

    20. 5.9 Crews and Productivity Rates - Backfill - Quiz

    21. 5.10 Crews and Productivity Rates - Material Handling

    22. 5.10 Crews and Productivity Rates - Material Handling - Quiz

    23. 5.11 Crews and Productivity Rates - Dewatering

    24. 5.11 Crews and Productivity Rates - Dewatering - Quiz

    25. 5.12 Crews and Productivity Rates -Slope Protection

    26. 5.12 Crews and Productivity Rates - Slope Protection

    27. 5.13 Addressing Unforeseen Conditions and Their Cost Impact

    28. 5.13 Addressing Unforeseen Conditions and Their Cost Impact -Quiz

    29. 5.14 Assignment – Developing a Cost Breakdown for Earthworks

    1. 6.0 Introduction

    2. 6.1 Understanding Indirect Costs

    3. 6.1 Understanding Indirect Costs - Quiz

    4. 6.2 Cost Estimate Review - Ensuring Completeness and Accuracy

    5. 6.2 Cost Estimate Review - Ensuring Completeness and Accuracy - Quiz

    6. 6.3 Cost Estimate Validation Techniques

    7. 6.3 Cost Estimate Validation Techniques - Quiz

    8. 6.4 Real-World Case Studies on Handling Indirect Costs and Risk Allocation

    9. 6.5 Assignment – Reviewing and Adjusting a Sample Cost Estimate

About this course

  • $1,360.00
  • 96 lessons
  • Total learning commitment to complete this course: 80 hours.
  • Course format: text, presentations, audio, downloadable PDF's.

Collaboration is essential

The benefit of timely feedback.

All lessons have a dedicated discussion section so you can ask questions, see previously answered questions, interact with other course participants and your instructor. You do not have to go through this learning journey alone or have to ponder on unanswered questions.

Sharpen Your Scope: Estimating That Matches the Work

This course is part of a hands-on estimating series built around trade-specific construction scopes. Learn to price activities with precision, structure crew logic, and build defensible estimates. Bundle all and save 35%; your discounted total appears below.